Dhamar Water Supply System Project- Dhamar City
Date of Handing over : 28/7/2011
Grand Total of project cost : 9,959,140.66 $
Location : Dhamar City
Description of the project :
-
supply & installation of 20km main transmission Ductile pipelines.
-
Supply and installation of internal distribution network of polyethylene pipelines ,53 km in length .
-
Extension of wastewater treatment plant with (120000)m3 capacity .
-
Construction of reinforced concrete ground reservoir with 6700m3 capacity at Al-Qarn crest with chlorination system.
-
Generators building.
-
Electrical transformers building .
-
Chlorination system building.
-
Guards Building.
-
Construction of reinforced concrete ground reservoir (6000 m3 capacity)at Herran crest with the chlorination system.
-
Generators building.
-
Electric Transformers building.
-
Chlorination system building.
-
Guards Building.