Construction of Underpass & Flyover at 50 Street/Taiz Street

Date of Handing over : 6/3/2014

Grand Total of project cost :  10,564,645 $

Location : The project is situated at the southern side of the Capital Sana’a (AL-Sabaeen Directorate) Al-Khamseen St.-Taiz St. intersection (Dar Salm Round about ).

Description of the project :

  • Concrete flyover for vehicles traffic that are heading to AL-Khamseen st. with a length of 670 m and a width of 15.5 m -  4 lines traffic and net width of 7.10 m for each traffic way.

  • Concrete tunnel for the vehicles flow through Taiz street with a total length of 540 m and a width of 16.25 m – 4 lines traffic and width of 7.52 m for each traffic way.